01Current-host and site dependency reviewA review of the existing host, domain and DNS arrangements, SSL, forms, databases, email records and other dependencies that must be identified before a move. Scope should be confirmed with Bosseo.
02Representative speed and page-experience reviewTesting of selected Fussels Corner service pages and intake paths on relevant devices and connection conditions, with findings tied to the pages measured rather than a generalized performance promise.
03Migration and cutover planA proposed sequence for moving the site, validating the destination, checking redirects and SSL, and coordinating DNS. The exact plan and any downtime assumptions should be confirmed before approval.
04Intake endpoint verificationA post-change review of public forms, phone links and other agreed intake routes, including test submissions and confirmation of where those submissions should arrive.
05Backup and recovery scope reviewA documented discussion of daily backups, covered assets, restore responsibilities and post-restore checks. Retention and recovery objectives should be agreed rather than assumed.
06Hosting responsibility recordA practical record of who handles monitoring, patches, SSL, security escalation, domain and DNS access, and site-level changes. This reduces uncertainty between the firm and other vendors.