01Current-host reviewA review of the firm’s present hosting arrangement, site structure, performance condition and known operational constraints. The scope should state what can be verified and what requires access from the current provider.
02Migration and cutover planA written review of the proposed move, including site files, database, DNS, SSL and email-record responsibilities as described in Bosseo’s published product information. Confirm the testing and post-cutover checks before approving the move.
03Speed and stability reviewA comparison of the current site’s measured condition with the proposed hosting arrangement. Treat any test result as a condition observed at that time, not as a ranking or lead forecast.
04Backup and recovery reviewA plain-language description of daily backups, restoration responsibility, covered components and post-restoration verification. Ask questions about retention and recovery procedures rather than assuming details not stated in the product materials.
05Security and monitoring scopeA review of the managed security and SSL responsibilities, firewall and DDoS protection described by Bosseo, monitoring coverage and the process for handling an alert or incident.
06Intake endpoint checkA review of the website’s forms, contact paths and other public inquiry endpoints after migration or infrastructure changes. This should identify what is tested and who receives any test inquiry.